Blog

James Duvall

Find me on:

Recent Posts

James Duvall | April 24, 2018

Is Obsolete Hardware and Software Destroying Your Productivity?

Like an overdue brake pad inspection, an obsolete system is a problem that can sneak up on you and cost you a lot of time and money to fix. System obsolescence is a big issue, and companies often don’t realize their components and systems are obsolete until it causes a crisis. Understanding the status of your system and components will help you make meaningful changes and upgrades that will help you get more life out of your systems.

James Duvall | April 17, 2018

Behind the Scenes of Modernizing Lockheed Martin’s F-35 Vehicle Systems Integration Facility

Remember the integrated data acquisition system  G Systems developed for Lockheed Martin’s F-35 Vehicle Systems Integration Facility (VSIF)? With more than 3000 analog, digital, and virtual channels, this highly scalable and reconfigurable system is responsible for simultaneously monitoring multiple aircraft sub-system integration tests and providing real-time data display and analysis.

James Duvall | February 09, 2018

Three Reasons Why Upgrading Your Operating System Is a Top Priority

Is your test system still running on an old operating system? In order to take full advantage of the gamut of improvements in audio and visual technology, it is necessary to modernize your equipment beyond the stock capabilities of the standard VHS player. Similarly, your test system – and any hardware or software system – also needs upgrades to continue to function reliably and avoid ever more costly downtime.

James Duvall | February 09, 2018

What to Expect During a System Migration

Do you have a vital test system lumbering along on a dinosaur of an operating system (OS)? Are you thinking of ditching the dino? There are a few problems you may run into. Here we discuss a few of the more common ones and how a system integrator like G Systems can help you work through them.

James Duvall | August 08, 2017

Five Little-Known Benefits of ATE Self-Testing

Your automated test equipment (ATE) is likely one of your organization’s most valuable assets – this is the tool that ensures your products are in safe and proper working order when they leave your facility. But, like any mechanical device, your ATE can experience issues. So, how do you prevent unexpected issues with your ATE?

On-Demand Webinar  How to Build a Test System with  Maximum Reuse   Watch Now

Latest Posts